Footprint Zero Case Study

Wolverhampton 240 kWp solar roof

Footprint Zero delivered a 260 kWp rooftop solar system for Manston Investment at the Wolverhampton headquarters of its tenant, Sherwood Stainless & Aluminium, cutting energy costs for an industrial business that runs two shifts a day.

260 kWp

Rooftop solar system

215,019 kWh

Clean electricity generated a year (average)

44t

CO₂e saved every year

The Project

  • Location: Wolverhampton
  • Landlord: Manstons Investment
  • Tenant: Sherwood Stainless & Aluminium
  • Installer: Ivegate
  • Funded by: Landlord with power sold to tenant through a PPA

Strategic Benefits

Wolverhampton

How we delivered it

Why the site suited solar

Heavy daytime demand: two shifts a day of energy-intensive industrial processes.

Suitable roof: structural integrity confirmed before design.

No planning needed: rooftop solar falls under permitted development.

Grid offer lapsed
The connection offer expired during the PPA talks.

What We Did

Assessed
roof structural survey to confirm the build.Designed: a 260 kWp system sized to the tenant’s demand.

Designed 
A 260 kWp system sized to the tenant’s demand.

Delivered
Installation by Ivegate.

Results

1,092t CO₂e

expected to be saved over 25 years

£0

Upfront cost to the tenant

No planning

needed (rooftop solar is a permitted development)

Project contact

Rupert Harrow | 07788316973 | rupert.harrow@footprintzero.co.uk

Smart solutions for a sustainable future.

FOOTPRINT ZERO LIMITED | Tel +44 (0) 1264 738154

Registered Office: Calder & Co, 30 Orange Street, London WC2 7HF – Registered UK Number 12328214